STP8393;FRANKLIN B over PHYLLIS CANAL
IN NAMPA;FRANKLIN BLVD. · County 027, Idaho · Built 1963 · 4 Lanes · 22,000 vehicles/day
Overall
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
43.58935, -116.553081
This bridge is in worse condition than 79.7% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
6TH STREET NORTH over PHYLLIS CANAL
Built 2000
STP8393;FRANKLIN B over PHYLLIS CANAL
Built 1963
10TH AVE N. over INDIAN CREEK
Built 1973
I 84B over INDIAN CREEK
Built 1951
9TH AVE N. over INDIAN CREEK
Built 1980
7TH AVE N. over INDIAN CREEK
Built 1978
STP8393;FRANKLIN B over PHYLLIS CANAL
Built 1963
1ST STREET NORTH over PHYLLIS CANAL
Built 1978
STP8393;FRANKLIN B over I 84;FRANKLIN BLVD IC
Built 2000
I 84 EBL over PHYLLIS CANAL
Built 2012
Bridge Details
- Structure #
- 000000000021875
- Year Built
- 1963
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 4
- Daily Traffic
- 22,000
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $522,000
- Total Project Cost
- $783,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.