STP8393;FRANKLIN B over PHYLLIS CANAL
IN NAMPA;FRANKLIN BLVD. · County 027, Idaho · Built 1963 · 5 Lanes · 18,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 6 | Satisfactory |
Location
43.593797, -116.553092
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
STP8393;FRANKLIN B over PHYLLIS CANAL
Built 1963
STP8393;FRANKLIN B over PHYLLIS CANAL
Built 1963
STP8393;FRANKLIN B over I 84;FRANKLIN BLVD IC
Built 2000
I 84 EBL over PHYLLIS CANAL
Built 2012
I 84 WBL over PHYLLIS CANAL
Built 2012
CHISHOLM DRIVE over PHYLLIS CANAL
Built 1996
6TH STREET NORTH over PHYLLIS CANAL
Built 2000
I 84 EBL over UPRR
Built 2011
I 84 WBL over UPRR
Built 2011
7TH AVE N. over INDIAN CREEK
Built 1978
Bridge Details
- Structure #
- 000000000021865
- Year Built
- 1963
- Length
- 9.1 m (29.9 ft)
- Max Span
- 8.8 m
- Width
- 20.1 m (65.9 ft)
- Lanes
- 5
- Daily Traffic
- 18,500
- Material
- Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $404,000
- Total Project Cost
- $606,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.