STC7983; USTICK RD over NOTUS CANAL
IN CALDWELL · County 027, Idaho · Built 2023 · 2 Lanes · 11,000 vehicles/day
Overall
Deck
9
Excellent
Superstructure
9
Excellent
Substructure
9
Excellent
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 9 | Excellent |
| Superstructure | 9 | Excellent |
| Substructure | 9 | Excellent |
Location
43.63395, -116.633322
This bridge is in worse condition than 3.4% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 3 years old.
Nearby Bridges
STC 7983;USTICK RD over I 84 EBL WBL
Built 2022
I84 EBL WBL over NOTUS CANAL
Built 2022
SMA 7923;LINDEN RD over NOTUS CANAL
Built 1968
I 84 EBL WBL over SMA 7923; LINDEN ROAD GS
Built 2022
STP 8213;MIDDLETON over I 84; MIDDLETON RD. GS
Built 2021
STP 8213;MIDDLETON over CALDWELL HIGHLINE CANAL
Built 1950
S7993;AVIATION WAY over CANYON HILL LATERAL
Built 2009
US 20 over SOLOMAN DRAIN
Built 2023
SH 55 over WILSON DRAIN
Built 1973
GEORGIA AVE over WILSON DRAIN
Built 2005
Bridge Details
- Structure #
- 000000000021816
- Year Built
- 2023
- Length
- 29.9 m (98.1 ft)
- Max Span
- 29 m
- Width
- 27.3 m (89.6 ft)
- Lanes
- 2
- Daily Traffic
- 11,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.