STP 8213;MIDDLETON over CALDWELL HIGHLINE CANAL
4.0 S. 0.3 E. MIDDLETON · County 027, Idaho · Built 1950 · 2 Lanes · 8,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.648578, -116.604858
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 76 years old.
Nearby Bridges
LINDEN ROAD over MASON CREEK
Built 1974
US 20 over MASON DRAIN DITCH
Built 1947
KNOT LANE over HIGH LINE CANAL
Built 1995
STC 7983;USTICK RD over I 84 EBL WBL
Built 2022
I84 EBL WBL over NOTUS CANAL
Built 2022
US 20 over FIFTEEN MILE CREEK
Built 1947
US 20 over SOLOMAN DRAIN
Built 2023
STC7983; USTICK RD over NOTUS CANAL
Built 2023
NHS 3761;NORTHSIDE over HIGH LINE CANAL
Built 1970
NHS 3761;NORTHSIDE over FIFTEEN MILE CREEK
Built 1970
Bridge Details
- Structure #
- 000000000019715
- Year Built
- 1950
- Reconstructed
- 1969
- Length
- 7.3 m (24 ft)
- Max Span
- 7 m
- Width
- 20 m (65.6 ft)
- Lanes
- 2
- Daily Traffic
- 8,900
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- $341,000
- Total Project Cost
- $512,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.