STC5758;BEAVER CRK over BEAVER CREEK
6.0 N. 1.0 E. WALLACE · County 079, Idaho · Built 1973 · 2 Lanes · 110 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
47.559897, -115.926639
This bridge is in worse condition than 65.5% of bridges in County 079. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
FS ROUTE NO. 271 over BEAVER CREEK
Built 1953
FS ROUTE NO. 933 over BEAVER CREEK
Built 1985
LOWER GEM HILL RD over CANYON CREEK;GEM BR
Built 2023
SH 4 over CANYON CREEK;TAMARACK BR
Built 2004
SH 4 over CANYON CREEK;FRISCO BR
Built 1999
I 90 EBL over S.FK.COEUR DALENE RIVER
Built 1978
TWO MILE GULCH over S.FK.CDA R;TWO MILE CR.
Built 1966
SH 4 over CANYON CREEK;LOWER MACE
Built 2004
I 90 WBL over I 90B;THIRD ST.IC
Built 1969
I 90 EBL over I 90B;THIRD ST.IC
Built 1969
Bridge Details
- Structure #
- 000000000020580
- Year Built
- 1973
- Length
- 11.3 m (37.1 ft)
- Max Span
- 10.7 m
- Width
- 7.3 m (24 ft)
- Lanes
- 2
- Daily Traffic
- 110
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $292,000
- Total Project Cost
- $438,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.