MONTOUR ROAD over PAYETTE RVR(MONTOUR BR)
0.6 N. 0.3 W. MONTOUR · County 045, Idaho · Built 1967 · 2 Lanes · 310 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 5 | Fair |
Location
43.932433, -116.3362
This bridge is in worse condition than 56.1% of bridges in County 045. The average bridge in Idaho is 0 years old; this one is 59 years old.
Nearby Bridges
SH 52 over SQUAW CREEK
Built 1956
BUTTE ROAD over SQUAW CREEK
Built 2006
STC 3840;SWEET-OLA over SQUAW CREEK;N.SWEET BR.
Built 1982
STC 3838;PLAZA RD over PAYETTE RIVER;PLAZA BR.
Built 1959
FULLER ROAD over BLACK CANYON CANAL
Built 1976
FROZEN DOG ROAD over BLACK CANYON CANAL
Built 1977
BOISE STREET over POWER CANAL
Built 1995
SH 55 over PAYETTE RIVER
Built 2021
SH 55 over POWER CANAL
Built 1994
PIONEER ROAD over SHAFER CREEK
Built 1988
Bridge Details
- Structure #
- 000000000019945
- Year Built
- 1967
- Length
- 94.2 m (309.1 ft)
- Max Span
- 18.3 m
- Width
- 8.9 m (29.2 ft)
- Lanes
- 2
- Daily Traffic
- 310
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,703,000
- Total Project Cost
- $2,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.