SH 97 over COEUR DALENE RIVER

0.6 N. HARRISON · County 055, Idaho · Built 2007 · 2 Lanes · 820 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000000018901
Year Built
2007
Length
184.7 m (606 ft)
Max Span
59.4 m
Width
14.1 m (46.3 ft)
Lanes
2
Daily Traffic
820
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000
Total Project Cost
$356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.