SH 3 over WILLOW CREEK

10.2 S. ROSE LAKE · County 055, Idaho · Built 2014 · 2 Lanes · 1,900 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010126
Year Built
2014
Length
16.8 m (55.1 ft)
Max Span
15.8 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
1,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.