I 90 EBL & WBL over CEDAR CREEK

12.6 E. COEUR DALENE · County 055, Idaho · Built 1988 · 4 Lanes · 15,000 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000000016950
Year Built
1988
Length
6.4 m (21 ft)
Max Span
6.4 m
Width
73.8 m (242.1 ft)
Lanes
4
Daily Traffic
15,000
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$238,000
Total Project Cost
$357,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.