I 90 EBL & WBL over CEDAR CREEK

11.6 E. COEUR DALENE · County 055, Idaho · Built 1988 · 4 Lanes · 15,000 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
000000000016930
Year Built
1988
Length
7.6 m (24.9 ft)
Max Span
7.6 m
Width
57.9 m (190 ft)
Lanes
4
Daily Traffic
15,000
Material
Steel
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$282,000
Total Project Cost
$423,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.