I 90 EBL over SMA 7445;SHERMAN AVE.IC
IN COEUR DALENE;SHERMAN · County 055, Idaho · Built 1960 · 2 Lanes · 12,750 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.673314, -116.751297
This bridge is in worse condition than 34.6% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 66 years old.
Nearby Bridges
I 90 WBL over SMA 7445;SHERMAN AVE.IC
Built 1960
I 90 EBL & WBL over STC7405; PENN AVE GS
Built 2020
POTLATCH HILL ROAD over SMA 7235;POTLATCH RD GS
Built 1960
I 90 WBL over STC 7325;ELM AVE.GS
Built 1960
I 90 over POTLATCH HILL RD. GS
Built 1992
I 90 EBL over STC 7325;ELM AVE.GS
Built 1960
I 90 EBL over SMA 7335;FIFTEENTH ST.IC
Built 1960
I 90 WBL over SMA 7335;FIFTEENTH ST.IC
Built 1960
FRONT AVENUE over CDA PARKING GARAGE
Built 2014
MULLAN TRAIL RD over I90;MULLAN TRAIL RD IC
Built 1991
Bridge Details
- Structure #
- 000000000016885
- Year Built
- 1960
- Length
- 16.5 m (54.1 ft)
- Max Span
- 16.5 m
- Width
- 12.2 m (40 ft)
- Lanes
- 2
- Daily Traffic
- 12,750
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $575,000
- Total Project Cost
- $863,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.