I 90 EBL over STC 7325;ELM AVE.GS

IN COEUR DALENE;ELM AVE. · County 055, Idaho · Built 1960 · 2 Lanes · 12,750 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000016865
Year Built
1960
Length
43 m (141.1 ft)
Max Span
14 m
Width
12.2 m (40 ft)
Lanes
2
Daily Traffic
12,750
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,060,000
Total Project Cost
$1,590,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.