SH 57 over UPPER W.BRANCH PRIEST R.

19.6 N. PRIEST RIVER · County 017, Idaho · Built 1937 · 2 Lanes · 2,700 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000014895
Year Built
1937
Reconstructed
1985
Length
90.2 m (295.9 ft)
Max Span
39.9 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
2,700
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,044,000
Total Project Cost
$3,100,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.