SH 55 over DEER FLAT CANAL
3.5 W. NAMPA · County 027, Idaho · Built 1973 · 5 Lanes · 19,500 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
43.604367, -116.674053
This bridge is in worse condition than 30.2% of bridges in County 027. The average bridge in Idaho is 0 years old; this one is 53 years old.
Nearby Bridges
MORENO DRIVE over DEER FLAT CALDWELL CANAL
Built 2006
MOSS LANE over PHYLLIS CANAL
Built 2005
SH 55 over PHYLLIS CANAL
Built 1973
S. FLORIDA over PHYLLIS CANAL
Built 2001
STC 3734;LAKE AVE over PHYLLIS CANAL
Built 1995
SH 55 over WILSON DRAIN
Built 1973
STC3753;LONE STAR over CALDWELL CANAL
Built 2010
STC8533;SMITH AVE over PHYLLIS CANAL
Built 2010
SH 55 over ELIJAH DRAIN
Built 1973
STC7983; USTICK RD over NOTUS CANAL
Built 2023
Bridge Details
- Structure #
- 000000000014705
- Year Built
- 1973
- Reconstructed
- 2017
- Length
- 7 m (23 ft)
- Max Span
- 7 m
- Width
- 29 m (95.1 ft)
- Lanes
- 5
- Daily Traffic
- 19,500
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $238,000
- Total Project Cost
- $356,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.