US 20 EBL & WBL over SALEM UNION CANAL

1.4 SW. ST ANTHONY · County 043, Idaho · Built 1984 · 4 Lanes · 12,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000012600
Year Built
1984
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
34.7 m (113.8 ft)
Lanes
4
Daily Traffic
12,500
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.