I 15 SBL over STC 1758;UPRR;INKOM OP
1.3 S. INKOM · County 005, Idaho · Built 1963 · 2 Lanes · 8,000 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.786608, -112.233817
This bridge is in worse condition than 72.7% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 63 years old.
Nearby Bridges
I 15 NBL over I 15B;S.INKOM IC
Built 1962
I 15 NBL over STC 1758;UPRR;INKOM OP
Built 1963
I 15 SBL over I 15B;S.INKOM IC
Built 1962
I 15 SBL over PORTNEUF RIVER
Built 1963
I 15 NBL over PORTNEUF RIVER
Built 1963
STC 1764; PARK ST. over PORTNEUF RIVER
Built 1940
I 15 NBL over RAPID CREEK;INKOM
Built 1963
I 15 SBL over RAPID CREEK;INKOM
Built 1963
W. LINCOLN AVE over RAPID CREEK
Built 1997
STC 1760; MAIN ST over RAPID CREEK
Built 2015
Bridge Details
- Structure #
- 000000000011150
- Year Built
- 1963
- Length
- 121.6 m (399 ft)
- Max Span
- 26.5 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 8,000
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,966,000
- Total Project Cost
- $4,449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.