STC 1760; MAIN ST over RAPID CREEK
MAIN STREET · County 005, Idaho · Built 2015 · 2 Lanes · 1,300 vehicles/day
Overall
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 8 | Very Good |
| Superstructure | 8 | Very Good |
| Substructure | 8 | Very Good |
Location
42.794444, -112.252778
This bridge is in worse condition than 11.7% of bridges in County 005. The average bridge in Idaho is 0 years old; this one is 11 years old.
Nearby Bridges
W. LINCOLN AVE over RAPID CREEK
Built 1997
STC 1764; PARK ST. over PORTNEUF RIVER
Built 1940
I 15 SBL over RAPID CREEK;INKOM
Built 1963
I 15 NBL over RAPID CREEK;INKOM
Built 1963
I 15 SBL over MAIN STREET GS
Built 1962
I 15 NBL over MAIN STREET GS
Built 1962
I 15 SBL over I 15B;W.INKOM IC
Built 1962
I 15 NBL over I 15B;W.INKOM IC
Built 1962
I 15 SBL over I 15B;S.INKOM IC
Built 1962
I 15 NBL over I 15B;S.INKOM IC
Built 1962
Bridge Details
- Structure #
- 000000000021908
- Year Built
- 2015
- Length
- 10.4 m (34.1 ft)
- Max Span
- 10.4 m
- Width
- 13.4 m (44 ft)
- Lanes
- 2
- Daily Traffic
- 1,300
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- City or Municipal Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.