I 86 EBL over I 84 WBL

13.8 E BURLEY · County 031, Idaho · Built 2020 · 2 Lanes · 19,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
8
Very Good

Bridge Details

Structure #
000000000010593
Year Built
2020
Length
137.8 m (452.1 ft)
Max Span
39.6 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
19,000
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Single or Spread
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.