SH 3 over I 90 EB-WB;ROSE LAKE IC

21.1 E. COEUR DALENE · County 055, Idaho · Built 1962 · 2 Lanes · 1,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000000010150
Year Built
1962
Reconstructed
1981
Length
63.7 m (209 ft)
Max Span
16.8 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
1,600
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
N/A
Total Project Cost
N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.