STC 5725;LATOUR CR over LATOUR CREEK
1.3 S. 1.6 W. CATALDO · County 055, Idaho · Built 1976 · 2 Lanes · 90 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
47.540028, -116.365339
This bridge is in worse condition than 34.6% of bridges in County 055. The average bridge in Idaho is 0 years old; this one is 50 years old.
Nearby Bridges
E. DUDLEY ROAD over LATOUR CREEK;DUDLEY BR.
Built 1976
CATALDO MISSION RD over I 90;CATALDO MISSION IC
Built 1964
STC 5725;LATOUR CR over LATOUR CREEK;SW.CATALDO
Built 1978
I 90 WBL over COEUR DALENE RIVER
Built 1964
I 90 EBL over COEUR DALENE RIVER
Built 1964
STC 1699;CANYON RD over COEUR DALENE RIVER
Built 1936
I 90 EBL over LATOUR CREEK ROAD IC
Built 1964
I 90 WBL over LATOUR CREEK ROAD IC
Built 1964
SOUTH RIVER ROAD over I 90;S RIVER RD GS
Built 1962
HILLTOP ROAD over I 90 EB-WB;HILLTOP RD.GS
Built 1967
Bridge Details
- Structure #
- 000000000030530
- Year Built
- 1976
- Length
- 22.9 m (75.1 ft)
- Max Span
- 22.3 m
- Width
- 9.1 m (29.9 ft)
- Lanes
- 2
- Daily Traffic
- 90
- Material
- Prestressed Concrete
- Design
- Tee Beam
- Owner
- Other Local Agencies
- Last Inspected
- N/A
- Est. Improvement
- N/A
- Total Project Cost
- N/A
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.