DIRT ACCESS ROAD over DRAINAGE DITCH
0.1 KM E OF WEST SHAW RD · County 095, Georgia · Built 1957 · 2 Lanes · 10 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
31.551111, -84.092917
This bridge is in worse condition than 83% of bridges in County 095. The average bridge in Georgia is 0 years old; this one is 69 years old.
Nearby Bridges
WEST SHAW ROAD over DRAINAGE DITCH
Built 1957
MOCK ROAD over MARINE CORP CANAL
Built 1965
SR 133 over MARINE CORP CANAL TRIB
Built 1941
SR 133 over MARINE CORP CANAL
Built 1942
SR3 RAMP over MARINE CORP CANAL
Built 2008
MOCK ROAD over MARINE CORP CANAL
Built 2014
SR 133 (SBL) over SR 3 (US 19-SR 300)
Built 1959
SR 133 (NBL) over SR 3 (US 19-SR 300)
Built 1959
US 19- SR 3 over MARINE CORP CANAL
Built 1959
SBL RAMP TO SR 3 U over MARINE CORP CANAL
Built 1959
Bridge Details
- Structure #
- 2GA1475
- Year Built
- 1957
- Length
- 24.7 m (81 ft)
- Max Span
- 6.2 m
- Width
- 7.7 m (25.3 ft)
- Lanes
- 2
- Daily Traffic
- 10
- Material
- Concrete
- Design
- Channel Beam
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $6,000
- Total Project Cost
- $38,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.