SR 133 (NBL) over SR 3 (US 19-SR 300)

ALBANY - SE SECTION · County 095, Georgia · Built 1959 · 3 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000009500480
Year Built
1959
Length
89.6 m (294 ft)
Max Span
25.3 m
Width
14.1 m (46.3 ft)
Lanes
3
Daily Traffic
14,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,462,000
Total Project Cost
$2,193,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.