SR 133 (SBL) over CSX RAILROAD

ALBANY - SE SECTION · County 095, Georgia · Built 1941 · 2 Lanes · 14,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000009500500
Year Built
1941
Length
50.3 m (165 ft)
Max Span
13.7 m
Width
8 m (26.2 ft)
Lanes
2
Daily Traffic
14,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$645,000
Total Project Cost
$967,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.