POPE CHAPEL ROAD over CHAPEL BRANCH

5.5 MI NE OF TIGNALL · County 317, Georgia · Built 1995 · 1 Lanes · 10 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031750450
Year Built
1995
Length
8.5 m (27.9 ft)
Max Span
8.5 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
10
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$80,000
Total Project Cost
$119,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.