SR 17 over BROAD RIVER

7.5 MI N OF TIGNALL · County 317, Georgia · Built 1971 · 2 Lanes · 2,150 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
000000031700090
Year Built
1971
Length
229.2 m (752 ft)
Max Span
31.7 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
2,150
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,938,000
Total Project Cost
$4,407,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.