US 78 over BEAVERDAM CREEK

2.9 MI W OF RAYLE · County 317, Georgia · Built 1964 · 2 Lanes · 3,480 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031700010
Year Built
1964
Length
25.6 m (84 ft)
Max Span
8.5 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,480
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$328,000
Total Project Cost
$492,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.