US 78 SR 10 over DRY FORK CREEK

9.5 MI SE OF LEXINGTON · County 221, Georgia · Built 1964 · 2 Lanes · 3,480 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000022100040
Year Built
1964
Length
61 m (200.1 ft)
Max Span
12.2 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
3,480
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$781,000
Total Project Cost
$1,172,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.