I-75 over SR 3 (US 41)

IN NW DALTON · County 313, Georgia · Built 2017 · 7 Lanes · 85,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031350940
Year Built
2017
Length
43.3 m (142.1 ft)
Max Span
43.3 m
Width
55.2 m (181.1 ft)
Lanes
7
Daily Traffic
85,100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,654,000
Total Project Cost
$18,981,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.