TIBBS ROAD over MILL CREEK TRIB

IN WEST DALTON · County 313, Georgia · Built 1960 · 2 Lanes · 3,730 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
000000031300650
Year Built
1960
Reconstructed
1978
Length
8.2 m (26.9 ft)
Max Span
3 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
3,730
Material
Concrete
Design
Culvert
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.