US 41 / SR3 over MILL CREEK

3.7 MI NW OF DALTON · County 313, Georgia · Built 1955 · 5 Lanes · 21,800 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031300120
Year Built
1955
Reconstructed
1988
Length
45.7 m (149.9 ft)
Max Span
9.1 m
Width
26 m (85.3 ft)
Lanes
5
Daily Traffic
21,800
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,066,000
Total Project Cost
$1,598,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.