US 129/SR 962(NBL) over TESNATEE CREEK

1.4 MI NORTHWEST OF CLEVE · County 311, Georgia · Built 2017 · 2 Lanes · 9,180 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000031150530
Year Built
2017
Length
103.6 m (339.9 ft)
Max Span
39.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
9,180
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$30,192,000
Total Project Cost
$45,288,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.