US 129 over TURNER CREEK

2 MI NW OF CLEVELAND · County 311, Georgia · Built 1959 · 2 Lanes · 9,730 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000031100020
Year Built
1959
Length
36.6 m (120.1 ft)
Max Span
12.2 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
9,730
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$469,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.