POBIDDY ROAD over POTATO CREEK
8 MI S OF THOMASTON · County 293, Georgia · Built 1956 · 2 Lanes · 660 vehicles/day
Structurally Deficient
— One or more key components rated 4 (Poor) or below
Overall
Deck
5
Fair
Superstructure
4
Poor
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 4 | Poor |
| Substructure | 5 | Fair |
Location
32.793522, -84.359472
This bridge is in worse condition than 95.1% of bridges in County 293. The average bridge in Georgia is 0 years old; this one is 70 years old.
Nearby Bridges
POBIDDY ROAD over FLINT RIVER
Built 2014
GORDON SCHOOL RD over TOWN BRANCH
Built 1955
GEORGE SMITH RD over HACKASOFKE CREEK
Built 1960
GEORGE SMITH ROAD over RICHLAND CREEK
Built 1960
SR 36 over FLINT RIVER
Built 2015
NEW HARMONY ROAD over WOLF CREEK
Built 1999
SR 36 over REEVES CREEK
Built 2016
US 80 over BARFIELD CREEK
Built 1998
US 19 NBL/ SR 3 over TOBLER CREEK
Built 1972
US 19 SBL / SR 3 over TOBLER CREEK
Built 1996
Bridge Details
- Structure #
- 000000029300180
- Year Built
- 1956
- Length
- 85 m (278.9 ft)
- Max Span
- 18.3 m
- Width
- 9.2 m (30.2 ft)
- Lanes
- 2
- Daily Traffic
- 660
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,090,000
- Total Project Cost
- $1,635,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.