US 80 over CSX RAILROAD

2.8 MI SE OF DRY BRANCH · County 289, Georgia · Built 2018 · 2 Lanes · 1,240 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028950100
Year Built
2018
Length
83.1 m (272.6 ft)
Max Span
39.3 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
1,240
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$24,220,000
Total Project Cost
$36,330,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.