US 80 HUBERT FLOYD over GC RAILROAD

7.5 MI E CENTRAL MACON · County 021, Georgia · Built 1983 · 2 Lanes · 2,630 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000002100110
Year Built
1983
Length
50.3 m (165 ft)
Max Span
18 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
2,630
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$645,000
Total Project Cost
$967,000