I-185 SBL over I-85 (SR 403)

2 MI NE OF LAGRANGE · County 285, Georgia · Built 1977 · 2 Lanes · 43,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028500850
Year Built
1977
Length
166.7 m (546.9 ft)
Max Span
44.5 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
43,300
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,137,000
Total Project Cost
$3,206,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.