I-85 (NBL) over SR 109

EAST EDGE OF LAGRANGE · County 285, Georgia · Built 1977 · 3 Lanes · 40,500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
000000028500660
Year Built
1977
Length
78.3 m (256.9 ft)
Max Span
25.3 m
Width
19.8 m (65 ft)
Lanes
3
Daily Traffic
40,500
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,278,000
Total Project Cost
$1,917,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.