BOILING SPRINGS RO over PENDLETON CREEK

7 MI E OF SOPERTON · County 283, Georgia · Built 1958 · 2 Lanes · 190 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028350280
Year Built
1958
Reconstructed
2003
Length
97.5 m (319.9 ft)
Max Span
6.1 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
190
Material
Prestressed Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,250,000
Total Project Cost
$1,875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.