I-16 EBL over SR 56 (US 221)

6.8 MI NE OF SOPERTON · County 283, Georgia · Built 1976 · 2 Lanes · 22,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000028300470
Year Built
1976
Length
50.6 m (166 ft)
Max Span
26.8 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
22,500
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$649,000
Total Project Cost
$973,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.