US 319 / SR 35 over NEW RIVER

3.5 MI NE OF TIFTON · County 277, Georgia · Built 1938 · 2 Lanes · 4,470 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000027700080
Year Built
1938
Length
13.1 m (43 ft)
Max Span
3 m
Width
12.1 m (39.7 ft)
Lanes
2
Daily Traffic
4,470
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$168,000
Total Project Cost
$252,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.