REICHERTVILLE RD over MCKEEVER SLOUGH CRK

7.5 MI SW OF BOSTON · County 275, Georgia · Built 2019 · 2 Lanes · 519 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000027551710
Year Built
2019
Length
39.6 m (129.9 ft)
Max Span
15.2 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
519
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$11,544,000
Total Project Cost
$17,316,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.