NEW HOPE ROAD over WARDS CREEK

APP 4 MI NE OF METCALF · County 275, Georgia · Built 1960 · 2 Lanes · 194 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027550120
Year Built
1960
Length
9.8 m (32.2 ft)
Max Span
4.9 m
Width
5.8 m (19 ft)
Lanes
2
Daily Traffic
194
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.