GEORGE GRIFFIN RD. over OCHLOCKNEE RIVER

APP. 5 MILES WEST OF COOL · County 275, Georgia · Built 2007 · 2 Lanes · 158 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551570
Year Built
2007
Length
8.2 m (26.9 ft)
Max Span
4.3 m
Width
6.2 m (20.3 ft)
Lanes
2
Daily Traffic
158
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$105,000
Total Project Cost
$158,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.