GEORGE GRIFFIN RO over OCHLOCKNEE RIVER

APP 5 MILES NORTHWEST OF · County 275, Georgia · Built 2007 · 2 Lanes · 158 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551560
Year Built
2007
Length
12.2 m (40 ft)
Max Span
6.1 m
Width
7.4 m (24.3 ft)
Lanes
2
Daily Traffic
158
Material
Concrete
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$156,000
Total Project Cost
$234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.