SR-3 ALT S.B.L. over CSX RR
N. THOMASVILLE BY PASS · County 275, Georgia · Built 1999 · 2 Lanes · 13,300 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.874131, -83.984331
This bridge is in worse condition than 30.7% of bridges in County 275. The average bridge in Georgia is 0 years old; this one is 27 years old.
Nearby Bridges
SR 3 ALT over OQUINA CREEK
Built 1985
SR 3 ALT over OQUINA CREEK
Built 1999
PINE TREE BLVD over OQUINA CREEK
Built 1990
OLD CASSIDY ROAD over OQUINA CREEK
Built 1988
COUNTY LINE ROAD over GOOD WATER CREEK
Built 1975
CHATHAM DRIVE over BRUCES BRANCH
Built 1955
CASSIDY ROAD over OQUINA CREEK
Built 1950
SR 3 ALT over OQUINA CREEK TRIB
Built 1985
US 19/ SR3 over GOOD WATER CREEK
Built 1959
WALCOTT STREET over BRUCES BRANCH
Built 1980
Bridge Details
- Structure #
- 000000027551420
- Year Built
- 1999
- Length
- 59.1 m (193.9 ft)
- Max Span
- 19.8 m
- Width
- 12.6 m (41.3 ft)
- Lanes
- 2
- Daily Traffic
- 13,300
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $758,000
- Total Project Cost
- $1,137,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.