COUNTY LINE ROAD over GOOD WATER CREEK
2 MI N OF THOMASVILLE · County 275, Georgia · Built 1975 · 2 Lanes · 3,940 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
30.889453, -83.976586
This bridge is in worse condition than 73.7% of bridges in County 275. The average bridge in Georgia is 0 years old; this one is 51 years old.
Nearby Bridges
OLD CASSIDY ROAD over OQUINA CREEK
Built 1988
US 19/ SR3 over GOOD WATER CREEK
Built 1959
SR 3 ALT over OQUINA CREEK
Built 1999
SR-3 ALT S.B.L. over CSX RR
Built 1999
SR 3 ALT over OQUINA CREEK
Built 1985
PINE TREE BLVD over OQUINA CREEK
Built 1990
SR 35- US 319 over GOOD WATER CREEK
Built 1985
SR 202 over BAY BRANCH TRIB
Built 1975
CHATHAM DRIVE over BRUCES BRANCH
Built 1955
CASSIDY ROAD over OQUINA CREEK
Built 1950
Bridge Details
- Structure #
- 000000027500400
- Year Built
- 1975
- Length
- 29.3 m (96.1 ft)
- Max Span
- 9.8 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 3,940
- Material
- Concrete
- Design
- Tee Beam
- Owner
- County Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $375,000
- Total Project Cost
- $563,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.