SR33 over PISCOLA CREEK

APP 3 MI NE OF BOSTON · County 275, Georgia · Built 1998 · 2 Lanes · 640 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000027551210
Year Built
1998
Length
109.7 m (359.9 ft)
Max Span
12.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
640
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,407,000
Total Project Cost
$2,110,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.