EVERGREEN CHURCH R over WHITEWATER CREEK TRIB

5 MI S OF HOWARD · County 269, Georgia · Built 1950 · 2 Lanes · 50 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
000000026950050
Year Built
1950
Length
9.8 m (32.2 ft)
Max Span
4.9 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
50
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$125,000
Total Project Cost
$188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.