EMERALD LAKE DRIVE over EMERALD LAKE

3.1 M SE of FAYETTEVILLE · County 113, Georgia · Built 2016 · 2 Lanes · 200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000011350830
Year Built
2016
Length
12.8 m (42 ft)
Max Span
12.8 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
200
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$3,700,000
Total Project Cost
$5,550,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.