US 80 over POTTERS CREEK

10.1 MI E OF TALBOTTON · County 263, Georgia · Built 2015 · 2 Lanes · 460 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000026350810
Year Built
2015
Length
36.6 m (120.1 ft)
Max Span
36.6 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
460
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$10,656,000
Total Project Cost
$15,984,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.